Floating Wind and Hydrogen
4.3 MW Wind Turbine Generator (WTG), a 0.8 MW Wave Energy Converter (WEC) system, and a hydrogen system comprising a 1 MW electrolyzer, 48 MWh of energy storage, and a 1.2 MW fuel cell.
P-Demo is set to become the world’s first wind-wave-hydrogen unit, and it will be deployed at PLOCAN’s test site in Spain.
This innovative system is projected to deliver 11.05 Gigawatt hours (GWh) per year of renewable electricity to the grid, avoiding a total of 25,557 tonnes of CO2 equivalent during its first 10 years of operation, with a remarkable 100% relative greenhouse gas (GHG) emission avoidance