Energy Storage Integration In Wholesale Power Markets. Three Part Series. Part 1 :Southwest Power Pool

image credit: Photo by Mark Merner on Unsplash
Patrick McGarry's picture
Senior Director / Customer Success PCI

Patrick recently joined PCI as a Senior Director in May, 2019. He owns over 32 years of experience in commodity trading and owns an extensive record working closely with energy market...

  • Member since 2004
  • 113 items added with 43,110 views
  • Jul 8, 2021
  • 455 views

On February 15, 2018, the Federal Energy Regulatory Commission (FERC) issued Order 841, a landmark, unanimous, bipartisan order directing regional grid operators to remove impediments to electric storage participation in wholesale markets. More than three years later, markets are finally implementing the changes required under the order, enabling Energy Storage resources (ESR) to provide services that they’re technically capable of providing.

For a variety of reasons, the heavy lift required to implement these changes has caused some delays. On May 17 (2021), FERC denied MISO’s request for an extension to implement tariff changes (initially due by June 6, 2022) until March 1, 2025. MISO claimed it has been, “…placed in an unenviable position of choosing a path between conflicting goals that could jeopardize our capability to operate our 15-state wholesale grid reliably, efficiently, and securely.”

However, as the ESR implementation plans come more sharply into focus, PCI is starting a blog series on the progress of organized wholesale markets to implement FERC-ordered tariff changes. The series will focus heavily on the nuances and lessons learned following the completion of various ISO-sponsored market participant training classes.

SPP’s Current Response & Preparations

Last month (on May 20th), Southwest Power Pool (SPP) released a self-study curriculum to help market participants prepare for the introduction of ESRs into its Integrated Marketplace (IM) in compliance with FERC Order 841.  Market participant learning goals outlined in the SPP Learning Center (LMS), address the following aspects of how SPP Market Storage Resources (MSRs) are:

  1. Registered
  2. Committed
  3. Deployed
  4. Settled

Key highlights associated with these four topics are outlined below.

Registration
  • Only an ESR may register as an MSR, although registration as an MSR is not required.
  • An MSR is modeled as a generator and may provide all market products. Output can be positive or negative.
  • An MSR must be capable of providing 0.1 MW for at least one hour to be eligible for any product in the SPP IM. It must also provide derated one-hour capacity value.
  • The registered Maximum State of Charge (SOC) is used to validate the resource’s offer.
Commitment
  • The Charge/Discharge limits for MSRs are used instead of the Capacity Operating Limits utilized by non-MSR resources.
  • The ESR Loss Factor is the parameter needed for the Market Monitoring Unit.
  • The SoC forecast is used for forward-looking market studies, including for the DA market and RUC.
  • MSRs are committed, dispatched, and deployed the same as non-MSR resources, but with the ability to have negative output, which represents a resource that is charging in the market.
  • How an MSR is committed, dispatched, and deployed is dependent on its mode of operation.
    • Charge
    • Discharge
    • Continuous (both Charge and Discharge)
  • The market participant (MP) must enter “0” in the Charge and Discharge Minimum Limits to indicate to the market it is continuously dispatchable.
  • Market participants are the default managers of the SoC and SPP receives the SoC Forecast and Current SoC, which it uses as inputs. SPP accepts these values at face value.
Deployment
  • Discharging MSRs can provide not only energy but also operating reserves. They are cleared and deployed like non-MSRs having:
    • Regulation Up
    • Regulation Down
    • Spinning Reserve
    • Supplemental Reserve
  • Charging MSRs can also provide Regulation and Contingency Reserve to the market.
  • Energy dispatch modifies the MSR’s SoC.
  • Cleared Operating Reserve may not modify the SoC since deployment is not guaranteed.
  • SPP’s Cleared Operating Reserve has a 50% chance of deployment and, therefore a 50% impact on the SoC.
  • MSR deployment of operating reserves impacts the SoC just as the dispatch of energy does. However, Cleared Operating Reserve does not always get deployed. Therefore, for the enforcement of the maximum and minimum SoC constraints, Cleared Operating Reserves will impact the resources by SoC by 50% of the cleared product.

 

    Settlements
    Each MSR has one Meter Data Submittal Location (MDSL).
     
    • Submit positive meter values if the MSR charges
    • Submit negative meter values if the MSR discharged
    • Since MSRs can inject like a resource and withdraw like a load, SPP ensures accurate settlement charges and credits

    • An MSR may receive a credit via the Out-Of-Merit-Energy (OOME) charge type if it receives an OOME Dispatch Instruction to charge.

     

    Conclusion

    Energy Storage Resources are the key to achieving renewable energy targets and decarbonization efforts. Wholesale power markets are looking to embrace this technology by integrating them as part of an overall grid solution. PCI is engaged with SPP through its focus-group meetings as stakeholders continue to discuss the integration of ESRs into the Integrated Marketplace. PCI’s goal is to provide clients with (a) consultation and guidance while SPP navigates the MSR integration process and (b) to ensure a robust implementation of any deployed changes to the PCI Platform.

     

    This article first appeared :https://koi-3QNB0IB4NM.marketingautomation.services/net/m?md=hqIuu7x6Wsn3ySGopyoewJtdFKZGGAqZ

     

    Patrick McGarry's picture
    Thank Patrick for the Post!
    Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.
    More posts from this member
    Discussions
    Spell checking: Press the CTRL or COMMAND key then click on the underlined misspelled word.

    No discussions yet. Start a discussion below.

    Get Published - Build a Following

    The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

    If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                     Learn more about posting on Energy Central »