Tue, Apr 9

CASE STUDY: Substation built on former pond keeps New Orleans dry

24_entergy_sullivan_substation_whitepaper_1.pdf
1.94MB

Utility Entergy got creative and focused on collaboration to build a resilient substation for their client (the Sewerage & Water Board of New Orleans), empowering them to deliver essential services to the community during critical events. The project included:

  • A unique foundation design on settling soil
  • Added resiliency and mitigation features
  • Construction through extreme heat and a small footprint
  • Protection for the local community

Bonus! View the companion video here!

DOWNLOAD THE CASE STUDY NOW!