News
Savannah River Nuclear Solutions: High-Assay Low Enriched Uranium Production Preparations to Begin at Savannah River Site

The Savannah River Site's (SRS's)
HALEU is more desirable for use in nuclear power reactor designs because it allows for smaller designs, longer life cores, increased fuel efficiency and less waste.
"The projected demand for HALEU far exceeds the current supply," said HALEU Program Manager
The facility has begun preparations for the pending mission, which will include equipment repair, training, procedure revisions and environmental impact analysis. Support is also being provided by the SRNL to complete a detailed set of sample analyses to ensure the HALEU meets reactor material specifications and to certify the shipping containers for material transport. Down-blending is expected to begin in 2025.
"This approval is a win-win," said Hasty. "
To see more about HALEU, click here: https://www.youtube.com/watch?v=Kgw7FEkIwBo&t=46s SRNS-2023-1263
* * *
Original text here: https://savannahrivernuclearsolutions.com/news/news01.htm
Discussions
No discussions yet. Start a discussion below.
Get Published - Build a Following
The Energy Central Power Industry Network® is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.
If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.
Sign in to Participate