Energy Central News

Curated power industry news from thousands of top sources.

News

RINA Wins Contract for North Sea Sofia Offshore Wind Farm

  • Oct 27, 2021
  • 107 views
Source: 
CommsMEA

RWE has contracted RINA to provide cable verification services and offshore converter platform (OCP) construction site quality services for the Sofia offshore wind farm.

The 1.4-GW Sofia offshore wind farm will be on Dogger Bank in the central North Sea.

The company will provide third-party surveillance to support the supply of quality assurance services required to verify the cable design, the manufacturing cycle by inspection, the project specific type test and final acceptance testing along with reviewing cable handling and load out procedures.

The project includes a 220-km (137-mi) 320-kV high voltage DC offshore cables, running from the landfall area to the OCP as well as a 7-km (4-mi) onshore cable to connect from the landfall area to the onshore converter station.

Steve Cullen, Head of Project Procurement Solutions for Northern Europe at RINA, said: Our work includes cables consultancy verification, factory inspections, along with site QA/QC services, and a digital offering with the Kiber smart helmet system.

Discussions
Spell checking: Press the CTRL or COMMAND key then click on the underlined misspelled word.

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »