Tenders are invited for "in 18834 - supply of wind turbine technology - in 4"

The subject of this contract is the complete procurement of all works, services and supplies associated with the supply of wind power technology, namely 1 turbine - in 4 with an output from 2.1 mw / pc to 2.35 mw / pc within the project of the contracting authority entitled "3 . Wind power plant melc ve4 registration number cz.01.3.09 / 0.0 / 0.0 / 19_302 / 0018834, which are works according to the project documentation" wind farm moravice-melc - technology and cable routes "prepared by the designer senergos, as, ico: 26915413, se registered office drustevn 452 / 13a, 664 49 ostopovice, general designer ing. Marek horsk authorization number ckait 1004761, authorization in the field of technological equipment of buildings (hereinafter referred to as "project documentation"). The project documentation contains the wind farm project, while the subject of performance according to this contract are only supplies of technology 1 turbine in 4. The contracting authority provides project documentation as a whole so that all participants have all the information about the full range of activities and work that will be in take place. Construction readiness for the turbine is not the subject of this tender. Basic technical parameters: mast height - max. 95 m rotor length - max. 50 m stavby construction height with blade at top dead center - max. , 1 mw and max 2.35 mwprojected life of the power plant - min 20 yearsoperative noise - max 104 dbtransformer with output voltage 22kv no. 5 of the tender documentationthe part of the delivery will be the supply and installation of aircraft obstacle markings according to ucl conditions according to the issued opinion, which forms annex no. 4 of the tender documentationcolor of the tower - ral 7035, rotor 1/7 red ends ral 3020 on a 3 m wide tube (40 - 43 m high) the supplier must prove when handing over the turbine that the technology meets the requirements arising from the rules for the operation of the distribution system, which are available at https://www.cezdistribuce.cz/cs/energeticka- legislation ativa / pravidla-provozovani-ds.html (here are the conditions that must be met, including regulation). Communication interface for communication and command iec104. The subject of performance is also transport, installation and commissioning - commissioning means a positive result of all prescribed tests. All other detailed properties, procedures, requirements and specifications are listed in the project documentation, which is annex no. 3 to this tender documentation. The technical parameters of the subject of this contract are determined with the fact that the contracting authority allows their modification while maintaining the principle that power, range parameters, power, dimensional and weight parameters are set as maximum, unless otherwise specified for a particular parameter, with tolerance so so that the device can be bu Major organization : LHOTA BRNO S.R.O.

Address : antala staka 1859

14000 praha Country :Czech Republic Tender notice number : P20V00005483 Notice type : Tender Notice Open date : 2020-08-11

Tender documents : T454889473.html, A454889473.zip

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »