In one of my previous posts, I estimated there is $25 billion of transmission project opportunity at MISO.

Slide 11 of this MISO Board presentation shows where are those opportunities at MISO.

With this post, I wish MISO Good luck! And I sincerely hope MISO considers Alternatives to Transmission Solutions as well.

Discussions
Matt Chester's picture
Matt Chester on Dec 4, 2020

Here's slide 11 that you mentioned:

Can you explain a bit further for those of us less in the know what these options actually represent? 

Rao Konidena's picture
Rao Konidena on Dec 4, 2020

So, in essence, MISO T planning looks at a - "least regrets" plan given that the future is uncertain. The slide referenced is looking at the 20 years ahead into the future via 3 lens -

Future 1, this is the first lens: This is like a business as usual scenario. From MISO definitions, "The footprint develops in line with 100% of utility IRPs and 85% of utility announcements, state mandates, goals,or preferences.•Emissions decline as an outcome of utilityplans.•Load growth consistent with current trends." So pretty much, known plans without a lot of hypothesis and posturing.

Future 2, this is the second lens: Here's where the "what if" hypothesis starts. Again from MISO, what if  footprint "wide carbon emissions reduction of 60% by 2040.•Energy increases 30% footprint-wide by 2040 driven by electrification." The hypothesis being, you would need more transmission if 60% reductions by 2040 is a policy mandate plus some decent electrification goals.

Future 3, this is the third lens: This is the "go big or go home" - these are my words. Again from MISO, "footprint-wide carbon emissions reduction of 80% by 2040.•Increased electrification drives a footprint-wide 50% increase in energy by 2040." The lens here is, more aggressive emissions reduction with more electrification goals.

Going back to the least regrets part - what is the T plan that is a common denominator in these of these 3 futures? That's the end game here.

Helps?

Matt Chester's picture
Matt Chester on Dec 4, 2020

Very informative-- thank you kindly!

Rao Konidena's picture
Thank Rao for the Post!
Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.
More posts from this member

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »