
Transmission Professionals Group
The Transmission Professionals special interest group covers the distribution of power from generation to final destination.
Shared Link
MISO expects to file new cost allocation for long range transmission projects by Sep 2021
MISO System Planning Committee of the Board meeting materials show MISO expects to file a new cost allocation mechanism for long range transmission projects by fall this year.
Previously, MISO had cost allocation for baseline reliability, market efficiency and multi value projects.
MISO expects to file new cost allocation for long range transmission projects by Sep 2021
MISO System Planning Committee of the Board meeting materials show MISO expects to file a new cost allocation mechanism for long range transmission projects by fall this year.
Get Published - Build a Following
The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.
If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.
Sign in to Participate