MISO is finally at a point where long-term planning models and planning software must be revamped to incorporate the growing role of batteries. This stakeholder presentation highlights the need for MISO planning engineers to allow storage to address typical transmission planning violations.

Additionally, energy storage can reduce the need for network upgrades in generator interconnection studies. Right now, interconnection engineers are currently focused on identifying transmission projects to interconnect renewable projects, but, if energy storage is modeled and dispatched appropriately in planning models used for interconnection studies, storage can address the interconnection delays.

Discussions
Spell checking: Press the CTRL or COMMAND key then click on the underlined misspelled word.

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »