Part of Grid Network »

The Grid Professionals Group covers electric current from its transmission step down to each customer's home. 

Publication

OFFSHORE WIND TURBINE VESSEL CHARGING

image credit: OSWC
Charley Rattan's picture
World Hydrogen Leader Charley Rattan Associates

UK based offshore wind & hydrogen corporate advisor and trainer; Faculty member World Hydrogen Leaders. Delivering global hydrogen and offshore wind corporate investment advice, business...

  • Member since 2019
  • 3,458 items added with 2,306,602 views
  • Jul 11, 2022
  • 283 views

Access Publication

Background It typically takes 6 months to 1 year for the renewable energy produced by an offshore wind turbine to displace the carbon emissions required to build and maintain the wind farm [1].

Whilst an offshore wind turbine designed for a minimum 20 year lifetime offsets far more emissions than it produces, there is a drive within the industry to make offshore wind a truly zero-emission source of electricity.

Offshore wind turbines are maintained using marine gas oil powered vessels, which can contribute 10- 20% of the project life cycle carbon emissions [2].

For closer to shore projects, which make up the majority of installed capacity in the UK, Crew Transfer Vessels (CTVs) support turbine through-life operations and maintenance activities, with an estimated 4000 hours of CTV time producing 2000 Tonnes of CO2e per year for a single 180MW wind farm [3].

A candidate to reduce the carbon footprint of offshore wind maintenance activities is to use electric Crew Transfer Vessels (eCTVs). However, the limited energy density of battery storage severely reduces the operating capability and range of eCTVs, which limits the adoption of such vessels.

Having a method to charge batteries in the field – ideally during offshore downtime – would be a key enabler for the large-scale deployment of eCTVs to unlock carbon emission reductions.

There are multiple viable options available for transferring power from offshore turbines to a CTV, most of which have a well proven pedigree in the oil and gas industry [4]. Of all the available approaches, three feasible options were shortlisted for the project, with a high-level assessment of the relative advantages and disadvantages

Charley Rattan's picture
Thank Charley for the Post!
Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.
More posts from this member
Discussions
Spell checking: Press the CTRL or COMMAND key then click on the underlined misspelled word.
Julian Silk's picture
Julian Silk on Jul 12, 2022

Thank you for the post.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »