The Cost of Missing Opportunities in a Smart Grid Rollout

Dr. Hakan Umit's picture
Decision-making Expert for Large Scale Systems using Quantitative Methods Pôle Position

Self-starter technology development executive & management consultant with strong technical foundations in algorithm & software development. Digitalisation expert for a wide range of...

  • Member since 2021
  • 11 items added with 2,655 views
  • Mar 18, 2021
  • 360 views

I have just written an article that compares the cost of two smart grid rollout scenarios. When rolling out smart devices over a densely populated area of 1 million residential locations, the sub-optimal smart grid configuration can cost several million dollars (or 67% more in this case) more than a near-optimal rollout, which can be avoided by using rigorous network design algorithms.

https://www.linkedin.com/pulse/cost-missing-opportunities-smart-grid-rollout-dr-p-hakan-umit/

Dr. Hakan Umit's picture
Thank Dr. Hakan for the Post!
Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.
More posts from this member
Discussions
Spell checking: Press the CTRL or COMMAND key then click on the underlined misspelled word.
Matt Chester's picture
Matt Chester on Mar 18, 2021

Have you seen real-world examples that have realized this immense disparity in costs based on deployment methods-- I'd love to see the actual Goofus vs. Gallant of those roll outs in practice. 

Dr. Hakan Umit's picture
Dr. Hakan Umit on Mar 18, 2021

I saw a very similar case in which a specific PLC unit had to be located throughout an entire area of 6 million households, in both rural and densely populated areas. The DSO had foreseen a little over 3 million devices in their feasibility studies. Without any hesitation, I thought it could be improved, which led me do this very research. I created a mathematical model to find the optimum number & location of network units, which yielded near-optimal solutions. My tests showed only half of what was planned could cover the entire area, potentially saving over 150 million dollars in 15-20 years. The DSO suspended their plan. 

Matt Chester's picture
Matt Chester on Mar 19, 2021

Wow! That's a pretty staggering figure-- thanks for sharing. 

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »