Demonstration Reporting

Ed Reid's picture
Vice President, Marketing (Retired) / Executive Director (Retired) / President (Retired), Columbia Gas Distribution Companies / American Gas Cooling Center / Fire to Ice, Inc.

Industry Participation: Natural Gas Industry Research, Development and Demonstration Initiative Chair, Cooling Committee (1996-1999)   American Gas Association Marketing Section...

  • Member since 2003
  • 811 items added with 50,236 views
  • Apr 5, 2022
  • 380 views

This commentary suggests a reporting format for the renewable plus storage demonstration discussed in the prior two commentaries.

Pre-demonstration electricity generation infrastructure:

               Fuel                                                  Rated Capacity (MW)    Capacity Factor (%)        Annual Generation (MWh)                                              

  • Coal
  • Natural gas (CCT)
  • Natural Gas (SCT)
  • Nuclear
  • Other
  • Total

   Peak Demand      

   Capacity Reserve Margin

 

Initial demonstration electricity generation infrastructure:

Source                           Rated Capacity (MW)    Capacity Factor (%)        Annual Generation (MWh) 

  • Wind
  • Solar
  • Nuclear
  • Other
  • Total

   Design Peak Demand

   Design Capacity Reserve Margin

 

Initial demonstration electricity storage infrastructure:

Storage                  Rated Capacity (MWH)    Rated Discharge (MW)                                                                                  

  • Short Duration
  • Intermediate Duration
  • Long Duration
  • Total

Demonstration electricity demand growth:  ______(MW)

Demonstration electricity consumption growth: ______(MWH)

Demonstration electricity generation infrastructure additions:

Source                    Rated Capacity (MW)    Capacity Factor (%)        Annual Generation (MWh) 

  • Wind
  • Solar
  • Total

 

Demonstration electricity storage infrastructure additions:

   Storage                                       Rated Capacity (MWH)      Rated Discharge (MW)

  • Short Duration
  • Intermediate Duration
  • Long Duration
  • Total

 

Demonstration annual withdrawals from storage:

  • Short Duration
  • Intermediate Duration
  • Long Duration
  • Total

Demonstration emergency capacity requirements:

  • Total events (#)
  • Peak emergency demand (MW)
  • Total emergency consumption (MWH)

Pre-demonstration customer electricity bills: ______($/MWH)

Demonstration customer electricity bills: _______ ($/MWH) (Inflation adjusted)

 

 

 

This proposed demonstration project has several important objectives:

  • Create a unique renewable plus storage service area
  • Force design of a standalone capable renewable plus storage grid
  • Highlight the critical nature of electricity storage in this grid
  • Highlight the evolving status of grid storage technology
  • Highlight the sensitivity of this grid to daily and seasonal weather variations
  • Document in and out storage losses in real storage systems
  • Document inversion system losses in real grid operation
  • Demonstrate the advantages of storage at the generation sites
  • Establish the real cost of electricity in a renewable plus storage grid
  • Document the number and magnitude of grid emergencies
  • Document the effects of the transition to electric vehicles on the grid
  • Document the effects of the transition to electric appliances and equipment
  • Document the effects of the transition to electric industrial processes

The information collected using the form above should be available to the general public on a website designed to provide easily understandable access to information on the performance of the renewable plus storage grid demonstration, since this is the intended future national electric grid. The project should be treated as a learning experience for grid designers and operators, but also for customers served by the grid.

It is regrettable that the demonstration must begin with largely pseudo-storage, rather than physical storage systems. However, it is not possible to design and operate a reliable grid based on renewable generation without storage. The proliferation of renewable generation with conventional generation support has created the impression that renewable generation system design can be simple and inexpensive. However, in a fossil-free generation system, additional renewable generation plus storage must replace the conventional backup currently relied upon for generation when wind and solar generated electricity is not available in sufficient quantities to meet the contemporaneous demand of the electric grid.

Discussions

No discussions yet. Start a discussion below.

Ed Reid's picture
Thank Ed for the Post!
Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.
More posts from this member

Get Published - Build a Following

The Energy Central Power Industry Network® is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »