This group brings together the best thinkers on energy and climate. Join us for smart, insightful posts and conversations about where the energy industry is and where it is going.

Post

Tesla Shanghai Production for the Rest of 2020

Tesla Shanghai factory experts and key investors exchanged conference calls and the production level information from the call from Shengang Securities was obtained by Ranjing Finance, on March 1, 2020. Current production capacity of the first phase of the Tesla Shanghai plant is 2,000 units per week, with single shifts per day and overtime on Saturdays to extend the single shift time without affecting production capacity; the two shifts in March are expected to reach 3500 units/week; The entire first half of the production of 50,000 to 60,000. 

Read More

Brian Wang's picture

Thank Brian for the Post!

Energy Central contributors share their experience and insights for the benefit of other Members (like you). Please show them your appreciation by leaving a comment, 'liking' this post, or following this Member.

Discussions

No discussions yet. Start a discussion below.

Get Published - Build a Following

The Energy Central Power Industry Network is based on one core idea - power industry professionals helping each other and advancing the industry by sharing and learning from each other.

If you have an experience or insight to share or have learned something from a conference or seminar, your peers and colleagues on Energy Central want to hear about it. It's also easy to share a link to an article you've liked or an industry resource that you think would be helpful.

                 Learn more about posting on Energy Central »