Welcome to the new Energy Central — same great community, now with a smoother experience. To login, use your Energy Central email and reset your password.

Wed, Feb 21

ZERO EMISSIONS IRON AND STEEL PRE-FEED REPORT DEMO PLANT

calix-zesty-tech-zero-emissions-iron-and-steel-pre-feed-report-demo.pdf
1.52MB

ZERO EMISSIONS IRON AND STEEL PRE-FEED REPORT DEMO PLANT

The Pre-FEED study into a demonstration scale plant with a nominal output of 30,000 TPA DRI using the Calix ZESTY process technology has been undertaken.

 

 

This study aims to propose an initial Basis of Design (BoD) for a ZESTY plant whilst also considering possible Australian locations for a plant. Potential sites upon which a demonstration scale plant could be located where examined and compared on eleven different criteria with the results  Plant Site Selection Criteria for ZESTY Demo Plant H-DRI 30,000 TPA (page 15).

 

 

The resultant analysis provided three leading candidates being: Port Hedland in Western Australia, Port Kembla in New South Wales and Port Augusta/Whyalla in South Australia.

 

Hydrogen for Steel

 

 

Â