Welcome to the new Energy Central — same great community, now with a smoother experience. To login, use your Energy Central email and reset your password.

Consortium Puts Model MSPAR Floater Foundation Through Paces

The tests were conducted on a 1/44 scale MSPAR model at the Océanide facilities in South-East France and lasted for three weeks.

According to the developers, the results regarding the stability and behavior of the model during transport, installation and in-place conditions were well within industry standards and parameters and the concept is now ready for an Approval in Principle (AIP) and a full-scale prototype.

The companies, which signed a joint technology development agreement in December 2021, have fast-tracked the development of the concept and aim to complete Basic Design and certification principle by the end of 2022 and present a full-scale demonstrator to the market in the next two years.  Floating Wind and Hydrogen